My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:49 PM
Creation date
2/10/2014 2:17:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/7/2014
Doc Name
Response to weekly CQA adequacy
From
CC&V
To
DRMS
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * * *. * * ** 11.30.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 11.24.13 thru 11.30.13 <br />Days <br />S <br />I M <br />T <br />I W <br />T <br />F <br />S <br />Work Shifts <br />- <br />DIW <br />D/W <br />H <br />H <br />H <br />H <br />D = Day Shift H = Holiday —W = Weather <br />Day <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br />Low: 16T Cloud Cover: Partly cloudy to overcast . <br />High: 22 °F to 31 °F Precipitation: Snow Monday. <br />Wind: Calm to gusts at times. <br />Ames: Continuing construction tasks for HWY 67 and VLF. <br />Planning: Continuing construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />A) VLF (Phase 1) <br />Topsoil I Overburden Stripping: No topsoil or overburden stripping occurred. <br />Production drilling: Production drilling occurred during this reporting period within the planned VLF limits. <br />Production blasting: No production blasting occurred during this reporting period within planned VLF limits. <br />Structural Fill: <br />Ames worked on clearing snow from roads leading to the fill areas. No other cut or fill operations occurred during <br />this reporting period. <br />Clay (SLF) Processing: <br />Cameron Site: No Clay mining or processing occurred at the Cameron Site. Approximately, 244,860 tons of clay / <br />soil liner fill (SLF) material have been produced at the Cameron site. SLF produced from the operation remains <br />stockpiled at Cameron Site for later removal / use. <br />Squaw Gulch Clay Borrow Site: No Clay mining or processing occurred at the Squaw Gulch Clay Borrow Site. <br />Approximately, 3,100 tons of soil liner fill material has been produced at the Squaw Gulch Clay Borrow Site to date. <br />Underdrain System: <br />Secondary Underdrain: No secondary underdrain was installed during this reporting period. Approximately, a <br />total of 3,854 feet of Secondary underdrain has been completed. <br />Page 1 of 4 MLE2 WE 11.30.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.