Laserfiche WebLink
CQA ACTIVITIES: <br />T= <br />1) Field Activities: Observation of construction activities during this reporting period included: Production drilling and <br />blasting; VLF cut to fill and compaction; Underground remediation and confirmation drilling; Slope grading; Slope <br />grading at Topsoil Stockpile #34; Timber / tailings removal from the crib wall; Secondary underdrain work; and clay (Soil <br />Liner Fill —SLF) and Drain Cover Fill (DCF) processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 77 -S through 79 -S were obtained during this reporting period. Note that samples with the suffix <br />" -S" indicate the material originated from the Squaw Gulch Borrow Site; sample numbers lacking the suffix are from <br />the Cameron Site. <br />DCF: Sample Numbers 44 and 45 were obtained during this reporting period. <br />General Project Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on December 1811 between CC &V, Ames, and <br />Amec. <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None. <br />Deliveries: None <br />Submitted by: Eric Lorenson <br />CQA Monitor <br />Reviewed By: <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By: _ <br />CC &V Projects <br />Date: 2 -6 -14 <br />Date: 21 Dec. 2013 <br />Date: <br />Page 3 of 6 MLE2 WE 12.21.13.doc <br />