Laserfiche WebLink
1 <br />0 <br />Natural Soda, Inc. <br />2013 Project Status Report & Annual Plan of Development <br />4.1.3 Process, Utilities, Facilities <br />The plant was expanded to accommodate a new boiler in order to increase NSI's <br />production capacity while at the same time reducing emissions in 2011/2012. A new <br />boiler was brought online in 2012 as part of the overall expansion project. A new flash <br />dryer was installed as part of the second production line in 2013. Plant expansion was <br />completed in 2013 meeting the goal of finishing the addition of a second production line. <br />Figure 5 illustrates the general process flow. <br />Figure 5: General Flow Process <br />recovery <br />well <br />1 �j' <br />dewatering <br />1 <br />centrifuge <br />cooling <br />water i <br />1 <br />''� �t�tir9�`'h w' ��"a i4� � �. h?�, tsS '��'� ir„-d ; ax �M �• ����. 1 <br />pregnant liquor <br />jx 1 <br />1 <br />1 <br />rmn ----- Y-- - -- --I �� 1 <br />1 � 1 <br />` I 1 <br />Idlo alb <br />p,.mw q <br />mot..._. <br />- -.. J ...........t....... <br />bulk Mick toads <br />tDAUB & ASSOCIATES. INC. ,.,. 10 January 2014 <br />