My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-30_REPORT - M1973021
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1973021
>
2014-01-30_REPORT - M1973021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:54:51 PM
Creation date
2/3/2014 11:47:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Report
Doc Date
1/30/2014
From
Jeremy Deuto
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Annual Fee/Report
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 2013 Mining Summary <br />2.1 North Quarry <br />Mining in the North Quarry was completed in 2007, and as such, no mining activity occurred <br />in the main trunk of the North Quarry in 2013. As a result of mine office site improvements, <br />a small localized ridge was removed to improve site access and overall site aesthetics. The <br />ridge removal resulted in material being processed through the onsite facilities and localized <br />reclamation. The North Quarry is currently being used as a raw water storage reservoir for <br />the Town of Morrison and Al. The pond has a water elevation of approximately 6339.56 feet <br />above MSL. Figure 2 shows the current configuration of the North Quarry, including the <br />reservoir and North Repository and Figure 21 shows the localized ridge removal area. <br />2.2 Central Quarry <br />Mining activity was completed in the Central Quarry in 2001, and as such, no mining activity <br />occurred in the Central Quarry in 2013. As a result, the Central Quarry experienced no major <br />rock disturbances. Stripped materials including overburden, sillimanitic gneiss, and other <br />undesirable material from the South Quarry were deposited as reclamation backfill in the <br />Central Quarry during mining operations in 2013. Figure 3 shows the configuration of the <br />Central Quarry. <br />2.3 South Quarry <br />Mining operations continued in the South Quarry in 2013, with approximately 1.8 million <br />tons of sellable material processed onsite. The 2013 mining operations did not result in an <br />expansion of the South Quarry 2012 mining footprint. Mining occurred primarily on the west <br />(east facing) and south (north facing) portions of the South Quarry. The general <br />configuration of the South Quarry is shown in Figure 4. <br />Mining in the South Quarry occurred between approximate elevation 6740 and 7550 above <br />MSL. The mining resulted in several temporary mine highwall configurations on the order of <br />approximately 15 to 75 feet with benches on the order of 20 to greater than 50 feet. Mining in <br />2013 resulted primarily in existing highwall expansion and minor highwall development. <br />Total highwall height did not increase. Mining on Bench 6740 resulted in bench <br />"daylighting" where portions of the south highwall present during the 2012 Geotechnical <br />Addendum were removed completely. <br />In addition, mine haul roads were modified to accommodate the revised highwall <br />configuration, resulting in new or modified haul road highwalls. Approximate areas mined or <br />disturbed in the South Quarry are shown in Figure 4. Figures 5 through 20 document the <br />highwalls included in the scanline surveys conducted for the 2013 Geotechnical Addendum. <br />GEI Consultants, Inc 3 January 2014 <br />2013 Morrison Quarry Annual Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.