Laserfiche WebLink
The Central Quarry was mined to an approximate bottom elevation of 6330 above MSL <br />utilizing highwalls and benches at a nominal 1:1 (H:V) or steeper slope. In 2013, <br />reclamation continued within the Central Quarry. The reclamation consisted of placing <br />material stripped from mining activities within the South Quarry. Additional 2013 activities <br />within the Central Quarry included the construction of a runaway truck ramp and relocation <br />of a fuel dock. <br />In the South Quarry, mining activity continued in 2013. Mining continued between <br />approximate elevations 6740 and 7550 above MSL. The mining, utilizing highwalls and <br />benches, primarily occurred on the western (east facing) portions of the South Quarry. <br />Additional 2013 activities within the South Quarry included reclamation, construction and <br />maintenance of haul roads, construction of a runaway truck ramp, and overburden stripping. <br />GEI Consultants, Inc 2 January 2014 <br />2013 Morrison Quarry Annual Report <br />