Laserfiche WebLink
PSCM submitted bond release application SL -01 for the Peabody Sage Creek Mine (C -2009- <br />087) on April 8, 2011. PSCM originally requested Phase II bond Released for 462.4 acres of <br />interim program and permanent program lands. This request was revised to 445.8 acres of <br />interim program and permanent program lands via a letter from PSCM received by the <br />Division on June 29, 2012. SL -01 sought Phase II release of 445.8 acres of interim program <br />and permanent program lands that received Phase I bond release under SL -01 and SL -04 for <br />the Seneca 11 Mine (C -80 -005), which would change the remaining Phase I and II liabilities <br />to those shown in Table 3, third column. The Division approved the Phase 11 bond release for <br />445.8 acres of interim program and permanent program lands on September 5, 2013. <br />PSCM submitted bond release application SL -02 for the Peabody Sage Creek Mine (C -2009- <br />087) on July 17, 2013. Although the areas requested for release in the SL -02 application do <br />not fall within the Phased Bond Release rules due to the pre -law status of the lands, PSCM <br />seeks Phase I release of 67.40 acres and Phase II and III release of 68.79 acres of pre -law <br />lands that received partial Phase I release of 1.39 acres under SL -01 for the Seneca 11 Mine <br />(C -80 -005), <br />Table 3 - Change in Acreage of the Peabody Sage Creek Mine <br />Peabody Sage Creek Mine C- 2009 -087 Disturbance Area Acreage <br />Interim and Permanent Program Areas <br />C- 2009 -087 <br />C- 2009 -087 <br />C- 2009 -087 <br />C- 2009 -087 <br />Issuance <br />Pre SL -01 <br />Post SL -01 <br />Post SL -02 <br />Total Acreage <br />2076.70 <br />1912.80 <br />1912.80 <br />1844.01 <br />Pre -Law Phase I <br />1.39 <br />1.39 <br />1.39 <br />68.79 <br />Released <br />Pre -Law No Release <br />67.40 <br />67.40 <br />67.40 <br />0 <br />Pre -Law Phase III <br />0 <br />0 <br />0 <br />68.79 <br />Released <br />Interim /Permanent <br />497.90 <br />497.90 <br />52.10 <br />52.10 <br />Program Phase I <br />Released <br />Interim /Permanent <br />1161.60 <br />1161.60 <br />1607.40 <br />1607.40 <br />Program Phase II <br />Released <br />Interim /Permanent <br />118.10 <br />3 8.10 <br />38.10 <br />118.10 <br />Program No Release <br />Permanent Program <br />52.60 <br />52.60 <br />52.60 <br />52.60 <br />New Proposed <br />Disturbance (Previously <br />undisturbed) <br />Permanent Program <br />257.71 <br />79.56 <br />79.56 <br />79.56 <br />New Proposed <br />Disturbance (Previously <br />Phase III Released) <br />New Proposed <br />0 <br />14.25 <br />14.25 <br />14.26 <br />Disturbance (Revisions) <br />Peabody Sage Creek Mine Page 6 January 30, 2014 <br />Full Bond Release <br />