Laserfiche WebLink
January 22, 2014 C- 1996 -083 /13owie No. 2 Mine SLB <br />Gob Pile 44 was also inactive at the time of the inspection. The temporary stockpile of cover material on the <br />upper bench was stable. The toe of the pile, on the western edge, is very close to ditch D -F 19, but the ditch <br />appeared to be clear. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />PHOTOGRAPHS <br />Gob Piles #1, #2, and #4 <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />