My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Hayden Gulch Loadout Permit Action RN4 <br />PROJECT IDENTIFICATION <br />Task #: A01 State: <br />Date: 1 /10 /2013 County: <br />User. JLE <br />Colorado <br />Routt <br />Agency or organization name: DBMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C081 -A01 _ <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />006 <br />007 <br />011 <br />015 <br />018 <br />019 <br />020 <br />021 <br />024 <br />025 <br />028 <br />031 <br />032 <br />033 <br />034 <br />037 <br />040 <br />041 <br />045 <br />046 <br />047 <br />501 <br />502 <br />503 <br />504 <br />505 <br />506 <br />507 <br />Regrade Rail Loop <br />DOZER <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />79.85 <br />$54,538.15 <br />$36,418.39 <br />$ 1,967.78 <br />$695.00 <br />$908.00 <br />$2,163.93 <br />$7,739.00 <br />$557.75 <br />$1,888.26 <br />$5,577.48 <br />$2,230.99 <br />$89,777.63 <br />$18,191.62 <br />$142.70 <br />$26,317.26 <br />$740.35 <br />$21,456.69 <br />$2,894.18 <br />$181,986.69 <br />$3,581.37 <br />$10,795.20 <br />$9,491.65 <br />$3,578.11 <br />$5,710.47 <br />$38,015.00 <br />$172,456.07 <br />$9,323.00 <br />$55,566.02 <br />$45,779.87 <br />$15,897.76 <br />$25,695.21 <br />Regrade Rail Spur <br />DOZER <br />54.93 <br />Re de Facilities Area; Office/Parking Lot <br />DOZER <br />5.94 <br />Rip Facilities Area I <br />RIPPER <br />2.03 <br />Rip Haul Road HGLF -HR1 <br />RIPPER <br />2.65 <br />Re de Haul Road HGLF -HRI <br />DOZER <br />634 j <br />Finish Grade Disturbed Area <br />GRADER <br />56.63 <br />Regrade Truck Loop Pond <br />DOZER <br />1.68 <br />Regrade Rail Loop Pond <br />DOZER <br />5.70 <br />Regrade All Ditches <br />DOZER <br />8.41 <br />Re de Leach Field <br />DOZER <br />6.73 <br />Replace Topsoil on Rail Loop and Facilities Area <br />SCRAPERI <br />122.73 <br />Replace Topsoil on Rail Spur <br />SCRAPERI <br />24.87 <br />Seal Alluvial Wells HGDAL3 and 4 <br />BOREHOLE <br />0.00 <br />Drill Seed Mix #1 <br />REVEGE <br />57.20 1 <br />Drill Seed Mix #2 <br />REVEGE <br />2.40 <br />Drill Seed Mix #3 <br />REVEGE <br />42.90 <br />H droseed Mix #3 <br />REVEGE <br />2.00 <br />Demolish and Remove Structures <br />DEMOLISH <br />0.00 <br />Clean Sediment from Ponds Once During Liability <br />Period <br />TRUCKI <br />7.01 <br />1. <br />Site Maintenance Over the Ten-Year Liability <br />Period $52,676 <br />SITEMAINT <br />ENANCE <br />80.00 <br />Mob/Demob equip. for Reclamation of Loadout <br />Area and TAHR <br />MOBILIZE <br />3.60 <br />Mob/Demobilization for Pond Removal <br />MOBILIZE <br />3.60 <br />` Mob/Demobilization for Maintanence and Pond <br />Cleaning <br />MOBILIZE_ <br />3.60 <br />Rip TAHR <br />RIPPER <br />55.40 <br />Remove TAHR Surface Material to Pit <br />j SCRAPERI <br />104.56 <br />Grade TAHR to Blend <br />( GRADER <br />66.61 <br />Replace Topsoil from Stockpile A to TAHR <br />Stations 114 to 216 <br />SCRAPERI <br />33.69 <br />Replace Topsoil from Stockpile C to TAHR <br />Stations 92 to 144 <br />SCRAPERI <br />27.76 <br />Replace Topsoil from Stockpile D to TAHR <br />Stations 76 to 92 <br />SCRAPER! <br />{ 9.64 <br />Replace Topsoil from Stockpile E to TAHR <br />Stations 40 to 76 <br />SCRAPER! <br />15.58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.