My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # AO <br />Page 2 of 2 <br />508 <br />509 <br />510 <br />511 <br />512 <br />Replace Topsoil from Stockpile F to TAHR <br />Stations 16 to 40 <br />SCRAPERI <br />2 <br />2 <br />1 <br />1 <br />1 <br />7.02 <br />$11,571.12 <br />$7,508.01 <br />$7,390.56 <br />$5,694.37 <br />$7,562.38 <br />Replace Topsoil from Stockpile G to TAHR <br />Stations 0 to 16 <br />SCRAPERI <br />4.55 <br />Drill Seed Mix 5 on TAHR <br />REVEGE <br />24.40 <br />Drill Seed Mix 3 on TAHR <br />REVEGE <br />18.80 <br />FDrift Seed Cropland on TAHR <br />REVEGE <br />66.90 <br />SUBTOTALS: <br />1015.71 <br />$891,808.02 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$18,014.52 <br />Performance bond: <br />1.05% <br />Total = <br />$9,36398 <br />Job superintendent: <br />507.86 hrs <br />Total = <br />$33,218.80 <br />Profit: <br />10.00% <br />Total = <br />$89,180.80 <br />TOTAL O & P = <br />$ 149,778.10 <br />CONTRACT AMOUNT (direct + O & P) = <br />$1,041,586.12 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25% <br />5.41% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $44,267.41 <br />$56,349.81 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $250.395.32 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,142,203.34 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.