My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade Rail Loop <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Permit Action: RN4 <br />Page 1 of 2 <br />Permit/Job#: C1992081 <br />Task #: 001 State: Colorado Abbreviation: <br />Date: 1/10/2013 County: Routt Filename: <br />User. JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D l OT - IOSU <br />574 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $341.51 <br />Total Fleet Cost/Hour. $683.03 <br />MATERIAL QUANTITIES <br />Initial Volume: 64,000 <br />Swell factor. 1.125 <br />Loose volume: 72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$110.73 <br />NA <br />Operating Cost/Hour. <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$10.01 <br />100 <br />Operator Cost/Hour <br />$37.41 <br />NA <br />Total unit Cost/Hour: $341.51 <br />Total Fleet Cost/Hour. $683.03 <br />MATERIAL QUANTITIES <br />Initial Volume: 64,000 <br />Swell factor. 1.125 <br />Loose volume: 72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />( (AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method 1.000 <br />+ (GEN.) <br />None <br />001 <br />CIRCES Cost Estimatiiig Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.