Laserfiche WebLink
Bulldozer Worksheet Cont d Task ## 020 Page 2 of 2 <br />Visibility. <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 668.65 LCY/hr <br />Adjusted fleet production: 13373 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost $0.496/LCY <br />Total job time: 8.41 Hours <br />Total job cost: $5,577.48 <br />CiRCES Cast Estimating So ivare <br />