Laserfiche WebLink
BULLDOZER WORK <br />Task description: Degrade Leach Field <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Permit Action: RN4 <br />Task #: 021 State: <br />Date: 1/10/2013 County. <br />User. ME <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Colorado <br />Routt <br />DRMS <br />Page 1 of 2 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -021 <br />Basic Machine: Cat D10T - 10SU <br />Source <br />Horsepower. 574 <br />( (AVG.) <br />Material consistency: 0.900 <br />Blade Type: Semi - Universal <br />Dozing method: 1.000 <br />{ (GEN.) <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$110.73 <br />NA <br />Operating Cost/Hour. <br />$183.36 { <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour.. $331.50 <br />Total Fleet Cost/Hour: $331.50 <br />MATERIAL OUANTITIES <br />Initial Volume: 4,000 <br />Swell factor: 1.125 <br />Loose volume: 4,5(10 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,718.9 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,400 feet <br />2,650 lbs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />( (AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />{ (GEN.) <br />CIRCES Cost Estimating Software <br />