Laserfiche WebLink
Scraper Worksheet Cont'd Task # 024 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 6400 feet <br />Net Correction: 0.830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt_ little maintenance. no water. 1" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) : Travel Time <br />! (ruin) ! <br />1 2000.00 3.00 4.00 7.00 1362 ; 1.54 <br />Haul Time: 1.54 minutes <br />Der...... D'..,ro• <br />Seg # <br />Scraper <br />Push Dozer Source <br />Altitude Ad': <br />1 1.000 <br />NA (CAT HB) <br />Job Efficiency: <br />1 0.830 <br />NA 1 (CAT HB) <br />Site Altitude: 6400 feet <br />Net Correction: 0.830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt_ little maintenance. no water. 1" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) : Travel Time <br />! (ruin) ! <br />1 2000.00 3.00 4.00 7.00 1362 ; 1.54 <br />Haul Time: 1.54 minutes <br />Der...... D'..,ro• <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />%) <br />Roll. Res ( Total Res <br />%) ( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />-3.00 <br />4.00 1 1.00 <br />2963 <br />0.79 <br />Return Time: <br />0.79 <br />minutes <br />Total Scraper team cycle time: <br />3.93 <br />minutes <br />Adjusted for job conditions: <br />734.96 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production <br />734.96 <br />LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production <br />734.96 <br />LCY /Hour <br />Unadjusted unit production/hour: 885.50 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.995 <br />Team(s) Total job time: 122.73 Hours <br />/LCY Total job cost: $89.777.63 <br />CIRCES Cost Estimating Software <br />