My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of) <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on Rail Spur <br />Site: Hayden Gulch Loadout Permit Action: RN4 Permit/Job#: C 1992081 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 1110/2013 County. Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Support Equipn <br />- Scraper. Cat 637G <br />- Dozer. NA <br />-Load Area: NA <br />Dump Area: NA <br />Road Maintenance —Motor t <br />-Water <br />NA <br />NA <br />Abbreviation: None <br />Filename: C081 -025 <br />COSTShift basis: 1 per day <br />i <br />Q..,,nnrt Fm.intnant Maintenance Fauinment <br />Total work team cost/hour. $73150 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor. 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization - machine: <br />100 <br />NA NA <br />NA <br />NA <br />NA <br />Ownership cost/hour. <br />$100.38 <br />NA NA <br />NA <br />NA <br />NA <br />Operating cost/hour. <br />$235.35 <br />NA NA <br />tt NA <br />NA <br />NA <br />Ripper op. cost/hour. <br />NA <br />NA NA <br />NA <br />NA <br />NA <br />Operator cost/hour. <br />$30.02 <br />NA NA <br />NA <br />; NA <br />NA <br />Unit Subtotals: <br />$365.75 <br />NA j NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 j 0 <br />0 <br />( 0 <br />0 <br />Group Subtotals: <br />Work <br />$73150 Support: <br />$0.00 i Maint: <br />$0.00 <br />Total work team cost/hour. $73150 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor. 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume. <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.