Laserfiche WebLink
MOTOR GRADER t.,. OR K <br />Task description: Grade T_AIIR to Blend <br />Site: liavden Gulch Loadout Ptrniil Action: RN4 <br />PROJECT IDENTIFICATION <br />faik fi: 5 (1/ 3 sl:iic: C0101ado <br />Date: 1/1013013 County: Routt <br />User: ILL <br />.Agency or organization name: <br />IIOURLY EOUIPAIENTCOST <br />DRMS <br />Permit Tob#: 1-1992081 <br />;_bbreviatiox intone <br />Filename: C08I -503 <br />Basic Machine: CAT 14M <br />1.50 <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Finish grading (0 -2.5 mph) - 1.5 <br />Shift Basis: I per day <br />30 <br />degrees <br />Data Source: (CRG) <br />Cost Breakdown: <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Utilization % <br />Ovmership Cost`Hour: <br />541.37 <br />NA <br />Operating Cost/Hour: <br />367.74 _ ; <br />100 <br />Ripper Operating Cost/Hour: <br />S3.30 j <br />i 00 <br />Operator CosVHour: <br />537.55 t <br />NA <br />Total Unit Cost,Hour: <br />$139.95 <br />Total Fleet CoadHour: $139.95 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />DOURLY PRODUCTION <br />110.10 <br />Seneca II -W Permit Pame 25 -I -25 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 _ <br />feet <br />Unadjusted Hourly Unit Production: <br />_ <br />1.8364 <br />_ <br />acres.'hour <br />.lob Condition Correction Factors <br />Site Altitude: 7500 feet <br />Source <br />Altitude Adj: 1.00 i (CAT IIB) <br />Job Efficiency: 0.90 i (1shid, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acresiHour <br />djtisivd iuuny Fleet Production: <br />1.6527 <br />acres+Hour <br />J0B 'I-Ii1IE AND COST <br />ri:, r ; .e: t -- - (ira'ierk,$) Toiai <br />job time: -- <br />- -- 66.6-2 Fours <br />t'tC•''Ei; =_i::. =::iurt;i; }, j:�t1r,,.�c: <br />