My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />SCRAPER TEAM WORK <br />Task description: - Replace Topsoil from Stockpile A to T.ADR Stations 114 to 216 <br />Site: Hayden Gulch Loadout Permit Action: RN4 Permit/Job #: C1992081 <br />PROJECT IDElNTIFICATION <br />Task #: 504 State: Colorado <br />Date: 1/1012013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C081 -504 <br />COSTShift basis: t per day <br />Equipment Description <br />- Scraper: 1 <br />Cat 637G w!usIi -pull <br />- Dozer: i <br />NA <br />Support Equipment -Load Area: E <br />NA <br />— -Dump Area: <br />%Utilization- machine: <br />Road Maintenance —Motor Grader: L CAT 14M <br />-Water Truck: ! Water Tan <br />Cost Breakdown: Scraner Work Team <br />gnnnnrt FrntinmPnt AitaentAn nr P—,;- .nt <br />j <br />Scraper <br />Dozer ! <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />! NA ' <br />NA <br />NA <br />25 <br />25 <br />Ownership cost'hour. <br />$100.38 <br />NA <br />NA <br />NA <br />$37.98 <br />$52.97 <br />Operating cost'hour- <br />$235.35 <br />( NA <br />NA j <br />NA <br />$16.94 <br />$29.77 <br />Ripper op. costihour: <br />NA <br />i NA j <br />NA ! <br />NA <br />$0.00 <br />i $0.00 <br />Operator cost/hour: <br />530.02 <br />NA <br />NA <br />NA <br />527.55 <br />$21.17 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$82.46 <br />$103.91 <br />Number of Units: ; <br />4 <br />0 <br />0 <br />0 <br />1 <br />I <br />Group Subtotals: <br />Work: <br />f $1,463.00 <br />Support: <br />$0.00 <br />Maint: <br />$186317 <br />Total work team cost/hour: 51.649.37 <br />MATERIAL OUANTITIES <br />Initial volume: 47,700 _ CCY Swell factor: 1.000 <br />Loose volume: 47,700 LCY <br />Source of estimated volume: Seneca 1I -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />IIOURLY PRODUCTION <br />Material weight: 2,100 lbs /LCY__ _ <br />Material description: Earth - Loam <br />Rated Payload: _ _81,600 pounds _ <br />Payload Capacity: 39.96 LCY <br />Scraper Bowl (volume) Basis: <br />_ Struck Volume: <br />24.00 <br />LCY <br />_ Heaped Volume: <br />34.00 <br />LCY <br />_ Averace Volume: <br />29.00 <br />LCY <br />Adjusted Capacity- <br />29.00 <br />LCY <br />CIRCES Cost Estimatine Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.