TAB 12 <br />FACILITIES <br />INTRODUCTION <br />Construction of the facilities at the Hayden Gulch Loadout (HGL) was completed during the <br />time period 1978 through 1980 by the previous owner /operator /permittee, H -G Coal <br />Company. The facilities were rated as a 1MM ton/year coal loadout and included the <br />following structures: <br />— Truck Dump Hopper <br />— Dump Hopper Conveyor Tunnel <br />— Dump Hopper Conveyor <br />— Crusher Building <br />— Stacker Tube <br />— Stacker Conveyor <br />— Powerhouses (2) <br />— Dust Suppression Pressure Tank Building <br />— Dust Suppression System Building <br />— Water Storage Tank <br />— Loadout Building <br />— Loadout Belt <br />— Haul Roads and Access Roads <br />— Railroad Spur and Loop <br />— Truck Loop Pond <br />— Rail Loop Pond <br />— Topsoil Stockpiles (3) <br />— Substation <br />— Office/Parking Lot/Leach Field <br />— Diversion Ditches <br />— Culverts <br />A significant modification to the permit was proposed in Technical Revision (TR -06). The <br />modification would have converted the facility from a loadout operation to a 2MM ton/year <br />Load -in operation. TR -06 was approved in June 2005. However, the proposed new facilities <br />were never constructed although the reclamation bond was increased at the time of approval <br />to cover the additional proposed facilities. These facilities included: <br />— Railcar Positioner and Hopper <br />— Railcar Dump hopper Belt Tunnel <br />— Dump Hopper Conveyor Tunnel <br />— Dump Hopper Conveyor <br />— Radial Stacker Pad <br />— Radial Stacker Boom <br />— System Control Building <br />TR -10 1 Revised 02/13 <br />