Laserfiche WebLink
SWEPI LP <br />Well: LHW 8118 <br />Purpose: Evaluate the cement bond in the well LHW 8118 after remedial squeeze job. <br />Solution Methodology: Survey the casing with CBL -VDL Logs. <br />Summary of Findings: The CBL -VDL indicates the Top of Cement (TOC) at 138ft. <br />The cement bond log quality can be seen from the analysis as follows: <br />Zone 1 - 138ft — 1015ft: The top of the tail cement is at approximately 138ft with fair to good <br />cement. Adequate isolation exists with this tail cement bonded interval. <br />61 Page <br />