My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-18_HYDROLOGY - P2010026 (7)
DRMS
>
Day Forward
>
Hydrology
>
Prospect
>
P2010026
>
2013-12-18_HYDROLOGY - P2010026 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:11 PM
Creation date
1/28/2014 9:15:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
HYDROLOGY
Doc Date
12/18/2013
Doc Name
4th Qtr Well Logs cover sheet and misc printed pages logs copied from discs separately
From
Shell Exploration & Production
To
DRMS
Email Name
THM
GRM
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWEPI LP <br />Well: LHW 8118 <br />Zone 3 - : 1180ft — 1453ft: This is interval of transition from good Lite Crete cement to free pipe. The <br />transition consists of fluid filled channeled cement. <br />Zone 4 - : Surface — 1180ft: There is no cement in the annulus and the pipe is free. <br />Conclusions: The Isolation Scanner Cement Bond Analysis indicates that cement bond is present in <br />the annulus behind the casing from 1453ft to bottom logged interval. Adequate bonding exists to <br />isolate the production zone and the saline water interval from the overlying fresh water bearing <br />intervals. The Top of Cement (TOC) is at 1180ft. <br />The TOC at 1180ft warranted a cement remedial job. This was done on 24- Sep -2013 which consisted <br />of setting in the 9 -5/8" casing a composite bridge plug at 1150ft, circulate the wellbore to fresh <br />water, squeeze perforating 3ft 4shots per foot at 1098 - 1101ft. Cement Retainer was set at 1082ft <br />and 15.8 ppg tail cement was pumped in with cement returns to surface. About 2bbls of 26ft cement <br />was set on top of the cement retainer. A copy of the EP Wells Daily Operation Report dated 24 -Sep- <br />2013 is presented on page 13 of the report. <br />A repeat CBL -VDL was done on 27- Nov -2013 to verify the cement isolation. <br />51 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.