Laserfiche WebLink
Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AV G.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2448 <br />Adjusted unit production <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />304.34 LCY /hr <br />304.34 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.820 /LCY <br />Total job time: <br />Total job cost: <br />10.60 Hours <br />$2,644.67 <br />Page 5 of 7 <br />