My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-01-24_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:14 PM
Creation date
1/27/2014 9:44:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/24/2014
Doc Name
Adequacy Review Letter (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
MR146
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AV G.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2448 <br />Adjusted unit production <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />304.34 LCY /hr <br />304.34 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.820 /LCY <br />Total job time: <br />Total job cost: <br />10.60 Hours <br />$2,644.67 <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.