My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-01-24_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:14 PM
Creation date
1/27/2014 9:44:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/24/2014
Doc Name
Adequacy Review Letter (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
MR146
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Pitkin Mesa Pipeline corridor <br />Permit Action: Minor Revision 146 <br />Task #: 352 State: Colorado <br />Date: 1/24/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUII <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />"MENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Page 4 of 7 <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -352 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,227 <br />Swell factor: 1.000 <br />Loose volume: 3,227 LCY <br />Source of estimated volume: BRL - 2 acres @ 12" <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20 % <br />Average site altitude: 7,725 feet <br />Material weight: 2,550 lbs /LCY <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,227 <br />Swell factor: 1.000 <br />Loose volume: 3,227 LCY <br />Source of estimated volume: BRL - 2 acres @ 12" <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20 % <br />Average site altitude: 7,725 feet <br />Material weight: 2,550 lbs /LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.