Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />ameO <br />used by AMEC to generate the geomembrane pane as -built drawing (Sheet 3 of 3 in <br />Appendix A). <br />1.6 Certification Boundary <br />Figure 2 presents the boundary of the areas being re- certified in this report. The work <br />completed within the certification boundary include removal of the damaged existing <br />geomembrane; SLF preparation /repairs and inspection; placement of the new <br />geomembrane, placement of backfill associated with the anchor trench, and the <br />placement of DCF over the newly installed geomembrane. The total area of the Phase <br />5 Slide Repair is approximately 1.11 acres. <br />sAprojects \1568 cc &v -ph v slide repair cqa \11.0 certification report \cc &v roc report.docx 4 <br />