My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/24/2014 9:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results Phase 5 Slide Repair
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56,000 <br />N 53,000 <br />N 50,000 <br />O O <br />O O <br />0 0_ <br />n n <br />yy w <br />IF <br />1 % <br />1 / <br />1 <br />1 / <br />I / <br />I <br />/ <br />I I/ <br />0 <br />/ <br />1 <br />I <br />I <br />1 <br />MILL <br />SITE <br />m <br />1/ <br />1/ <br />I/ <br />PHASE H VLF <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />I <br />i <br />I � <br />1 / <br />1 PHASE I VLF / <br />I / <br />I / <br />Q <br />lI-- <br />\ <br />1 \ <br />PHASE 5 VLF <br />I 1 <br />I i <br />\1 / <br />\v / <br />O <br />O <br />0 <br />w <br />9 <br />al, o <br />r <br />II ! 1I <br />'�- <br />DC, <br />t!q <br />e i <br />=tom_ � f <br />CITY OF <br />!� 6 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING DRAINAGES <br />D PHASE V SLIDE REPAIR BOUNDARY <br />6 STATE HIGHWAY <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TOPO — PHASE 1 — REVISED.DWG <br />(RECV MARCH 14. 2010) <br />SQUAW GULCH BASE TOPO — PHASE 2.DWG <br />(RECV APRIL 24. 2010) <br />SQUAW GULCH BASE TOPO — PHASE 3.OWG <br />(RECV MAY 4, 2010) <br />CCv TOPO EXPANSION 12 -29 -10 NORTH AREADWG <br />�:RECV JANUARY 13, 2011) <br />CCV TOPO EXPANSION 01 -28 -11 SOUTH AREA.DWC <br />'RECV JANUARY 28, 2011) <br />SHE TOPO 7- 07- 11.DWG <br />IRECV JULY 11, 2011) <br />VLF: TOPO EXPANSION 8- 05- 11.DWG <br />�RECV AUGUST 9, 2011) <br />09C28— COMOSRE —TOPO MILE UMTTS.DWG <br />IIRECV MAY 28, 2010 FROM CCdV) <br />400 0 400 800 FEET <br />I CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />I LABORATORY LINER EXTENSION I <br />PHASE 5 SLIDE REPAIR <br />CERTIFICATION BOUNDARY LIMIT <br />ec <br />DESIGNED BY <br />ALM <br />CHECKED BY <br />MEN <br />DRAWN BY <br />ALM <br />APPROVED <br />YEN <br />TRENAYE <br />FKgUR E No. <br />REV <br />FIGURE 2 <br />2 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.