My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/24/2014 9:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results Phase 5 Slide Repair
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l4 <br />F � � <br />(L 3 <br />hL WON <br />squA.e � <br />GULCH VLF <br />c <br />6 7 srTE <br />i I <br />81 <br />` PHASE IV VLF �Zl N. 53,000 __ / <br />�j� —�I I —� PHASE 5 VLF <br />SITE ; G <br />iw i LOCATION T <br />/ I <br />PHASE II VLF ©�v4 <br />N 50.000 <br />PHASE I VLF <br />i <br />I / / <br />' —_` <br />a Ir— <br />J 67 _ <br />� C <br />i N 47,000 <br />0 <br />W <br />I <br />I <br />81 <br />82 <br />i <br />o ,;I <br />8. <br />W <br />LEGEND: <br />-- _ ----- - <br />EXISTING GROUND SURFACE CONTOUR <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING DRAINAGES <br />C <br />SITE LOCATION <br />6 7 ( <br />STATE HIGHWAY <br />861 <br />COUNTY ROAD <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TOPO - PHASE 1 REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TOPO EXPANSION 12 -29 -10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TOPO EXPANSION 01 -28 -11 SOUTH AREk DWG <br />(RECV JANUARY 28, 2011) <br />SH6'1 TOPO 7- 07- 11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOPO EXPANSION 8- 05- II.DWG <br />(RECV AUGUST 9, 2011) <br />09028- COMOSTTE -TOPO MILE UMrrS.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />•00 0 <br />600 1600 FEET <br />CUEKT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />LABORATORY <br />LINER EXTENSION <br />uni <br />PHASE 5 <br />SLIDE REPAIR <br />SITE <br />LOCATION <br />DESIGNED BY <br />I ALM CHECKED BY <br />I MEN <br />DRAWN BY <br />AlN APPROVED BY <br />MEN <br />F11.ENAYE <br />FIGURE <br />No. <br />REV <br />Amec <br />FIGURE 1 <br />1 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.