Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 14, 2014 <br />3.0 GEOMEMBRANE INSTALLATION <br />The geomembrane utilized on this project was an 80 -mil double -sided textured LLDPE <br />geomembrane manufactured by Agru America. <br />3.1 Phase 5 Slide Repair System <br />Geomembrane installation activities for the Phase 5 Slide Repair liner system included <br />deployment, seaming, and non - destructive and destructive testing of 80 -mil double - <br />sided textured LLDPE geomembrane to project specifications. ECA deployed panels <br />P1 through P11 as part of the liner system in the area to be re- certified (approximately <br />48,150 square feet), as shown on Sheet 3 of 3 in Appendix A. <br />Ames anchored geomembrane at the limits of the Phase 5 Slide Repair with a <br />minimum of 2- foot -deep by 2- foot -wide anchor trench. The limits of the slide repair are <br />located on Sheet 1 of 3 in Appendix A. <br />s:\projects \1568 cc &v - ph v slide repair cqa \11.0 certification report \cc &v roc report.docx 6 <br />