Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Laboratory Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />ameO <br />Representatives for CC &V, Ames, Foresight West (QA Surveyor), and AMEC <br />conducted daily preconstruction coordination meetings throughout the construction <br />period. <br />1.3 Project Specifications <br />All work was performed in accordance with the design plans and specifications in <br />Amendment Nos. 8, 9, and 10 to Mining Permit No. M- 1980 -244, the Issued for <br />Construction Drawings, and the project Technical Specifications. <br />1.4 Certification Boundary <br />Figure 1 presents the boundary of the area being certified in this report. The work <br />completed within the certification boundary included site grading, subgrade <br />preparation, GCL placement, geomembrane placement, geotextile placement, <br />installation of the reinforced concrete slab and all associated embeds and accessories, <br />and backfill around the completed work. <br />sAprojects \1125m -cc &v lab liner extension\h2 - design \lab liner extension \roc report\lab liner roc report.docx 2 <br />