My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/21/2014 4:53:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results -Lab Liner Ext
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Laboratory Liner Extension <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 14, 2014 <br />6.0 CONCLUSIONS <br />In accordance with our responsibilities as the Certifying Engineer and as the Quality <br />Assurance Consultant for the Laboratory Liner Extension, and per the requirements of <br />the various applicable Colorado Division of Reclamation, Mining and Safety approvals, <br />AMEC Environment & Infrastructure, Inc. (AMEC) attests that it observed and <br />performed the required CQA activities for this project. Based on daily communications <br />with AMEC personnel; observations made during on -site visits; review of the laboratory <br />and field test results, AMEC attests that the Laboratory Liner Extension was <br />constructed in compliance with specifications as described in this document. <br />Sincerely, <br />AMEC Environment & Infrastructure, Inc. <br />Thorne M. Clark <br />Project Resident <br />(11/2012 through 11/2013) <br />alm /ALM <br />Michael E. Nelson, PE <br />Certifying Engineer /Project Manager <br />sAprojects \1125m -cc &v lab liner extension\h2 - design \lab liner extension \roc report\lab liner roc report.docx 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.