Laserfiche WebLink
the KOP depth of 1,400 feet MD KB reached on July 5, 2013. The slant section was <br />completed on July 11, 2013 to a depth of 1,986 feet MD KB, after setting and drilling <br />through 4 cement plugs. Five additional cement plugs were required to restore and <br />maintain circulation to drill out the cement to a depth of 1,960 feet MD KB. The <br />intermediate casing was set to a depth of 1,957 feet MD KB and cemented with a good to <br />fair cement bond across the two aquifer intervals (A- Groove and B- Groove) up to 1,450 <br />feet MD KB. A cast iron bridge plug was set at 1,450 feet MD KB inside the 7.625 -inch <br />casing and the casing was perforated at 1,445 feet and 1,444 feet MD KB. Cement was <br />squeezed through the perforations with good cement returns to surface, and subsequently <br />the annulus was topped off from surface. On July 20, 2013, drilling was completed on the <br />6.75 -inch horizontal section from 1,986 feet to 2,049 feet MD KB TD. A 5.5 -inch flush joint <br />production liner was hung in the hole. While drilling out the production section, a rapid <br />fluid rise to a total of 16.9 feet was noted in the 101-1-1 well indicating good communication <br />through the Boies Bed. The goal of drilling the 10H -1V well was achieved and successful. <br />Daub & Associates, Inc. Page 13 of 13 10H -1V Well Summary Report <br />