Laserfiche WebLink
301653.5584 <br />PO Box 485 <br />Broomfield, CO 80038 <br />y .,aryjtuttle @gmail.com <br />January 14, 2014 <br />Tim Cazier <br />DRMS <br />1313 Sherman Street <br />Room 205 <br />Denver, CO 80202 <br />Re: Technical Revision to M- 1986 -015, Pueblo East Pit`E' <br />Dear Mr. Cazier: <br />This letter and the enclosures contain the Technical Revision submittals as required in <br />your Inspection Report of December 4, 2013, which is enclosed. The information for the <br />Technical Revisions for both inspection topics (Hydrologic Balance and Sediment <br />Control) is included in this one Technical Revision submittal. Also enclosed is a check <br />for the $216.00 application fee. <br />Topic: Hydrologic Balance <br />Included are additions to the Mining Plan Maps and labeled as Exhibit C -8 to follow <br />exhibit numbering system started in Amendment 3. These seven sheets in Exhibit C -8 <br />contain the information requested. <br />Figure 1— all monitoring well locations (our new wells and existing residential wells) in <br />Phases 1 and 2 <br />Figure 2 — all monitoring well locations (our new wells and existing residential wells) in <br />Phase 7 <br />Figure 3 — graph of groundwater depths of our monitoring wells in Phases 1 and 2 <br />Figure 4 — graph of groundwater depths of the existing residential wells along 25th Lane <br />near Phases 1 and 2 <br />Figure 5 - graph of groundwater depths of all wells (our new wells and existing <br />residential wells) in Phase 7 <br />Table 1— List of well improvements to residential wells in Phase 7 <br />Table 2 - List of well improvements to residential wells in Phases 1 and 2 <br />RECEIVED <br />JAN 15 2014 <br />pvision of RwJamadon, <br />Nkft aster <br />