U <br />i <br />Primary Underdrain: No work was performed on the primary underdrain during this reporting period, A total of <br />1,294.60 feet of primary underdrain has been completed. <br />Tree /Slash Grubbinq and Clearing Chipping: <br />No clearing and grubbing occurred. <br />B) Underground Workings <br />No significant construction activities occurred. <br />Q Historical Crib Wall/ South MSE Wall: <br />No significant activities occurred at the Crib wall or South MSE Wall. <br />III) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation (Snow removal). <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Production drilling; Slope <br />grading; and clay (Soil Liner Fill —SLF) and Drain Cover Fill (DCF) processing. <br />M Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: None. <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: Note that work was suspended form December 23, 2013 to January 2, 2014 for the holiday break. <br />Deliveries: None <br />Submitted by: Eric Lorenson Date: 28 Dec. 2013 <br />CQA Monitor <br />Reviewed By: <br />Tim Burk-hard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By: <br />' <br />__'5 5� /'vn <br />CC&V Projects <br />Date: } - Z - l q <br />Date: j- /_3 ILI <br />Page 2 of 4 MLE2 VVE 12.28.13.doc <br />