-W -11 , <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125NO. * * * *. " *h* 12.28.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 12.22.13 thru 12.28.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />I)/W <br />N' <br />H <br />H <br />H <br />H <br />H <br />D = Dav Shift H = Holiday V1' = Weather Day <br />Cihuah <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br />Low: 5`F to 9 "F Cloud Cover: Overcast. <br />High: 19 °F to 28 "F Precipitation: Snow <br />Wind: Variable <br />Ames: Continuing construction tasks for the Historical Crib Wall / South MSE Wall and VLF. <br />Planning: Continuing construction activities and scheduling for Historical Crib Wall / South MSE Wall and VLF. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />11) <br />Note that work was suspended form December 23, 2013 to January 2, 2014 for the holiday break. <br />A) VLF (Phase 1) <br />Topsoil ! Overburden Stripping: No topsoil or overburden stripping occurred this week. <br />Production drilling: Production drilling occurred during this reporting period within the planned VLF limits. <br />Production blasting: One blast occurred within the VLF. <br />Structural Fill: Cat dozers graded the slopes downwards near station Q6 +00 to Q11 +00 towards station A6 +00. <br />Clay (SLF) Processing: <br />Cameron Site: No clay mining or processing occurred at the Cameron Site. Approximately, 244,860 tons of clay 1 <br />soil liner fill (SLF) material have been produced at the Cameron site. SLF produced from the operation remains <br />stockpiled at Cameron Site for later removal / use. <br />Squaw Gulch Clay Borrow Site: Clay processing took place at the Squaw Gulch Clay Borrow Site. <br />Approximately, 19,600 tons of soil liner fill material has been produced at the Squaw Gulch Clay Borrow Site to <br />date. <br />Underdrain System: <br />Secondary Underdrain: No secondary underdrain was installed during this reporting period. Approximately, 5,064 <br />feet of secondary underdrain has been completed to date in the VLF. <br />Page 1 of 4 MLE2 WE 12.28.13.doc <br />