Laserfiche WebLink
January 6, 2014 C- 1996 -083 /13owie No. 2 Mine BFB <br />The underdrain on the north side of gob pile 43 was being constructed. Small rock was sandwiched between <br />layers of fabric and then backfilled (photo 7). <br />Coverfill material had been stacked in a large pile along the side of the gob pile 42 access road. <br />ROADS — Rule 4.0311 Construction 4.03.1(3)/4.03.2(3)❑ Drainage 4.03.1(4)/4.03.2(4)11 Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6)❑ Reclamation 4.03.1(7)/4.03.2(7): <br />The main haul road to the facilities area was plowed and well maintained. The access road to gob pile #2 <br />was well maintained. <br />TOPSOIL — Rule 4.0611 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />Topsoil was not being salvaged on the east side of gob pile 43. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection and none are pending. <br />PHOTOGRAPHS <br />Photo 1 — Elk Grazing <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />Photo 2 — Pond B <br />