Laserfiche WebLink
Susan Burgmaier 07- Jan -2014 <br />C- 1996 -083 TR -84 PAR Page 5 of <br />Volume II <br />I. Map 15 -1 Mine Facilities: <br />a) Cross Section D -D' is drawn through CMWDA #3. This line, which appears on <br />Vol. XI Figure 1, should probably be removed from this map. <br />b) In the upper right -hand corner, a partial view of CMWDA #4 appears. The details <br />do not reflect those found on Map 15 -3, which was updated later. <br />c) The Haul Road which runs from SH 133B to the CMWDA should be labeled. <br />d) The scale in the lower right -hand corner says "half inch ", when "one inch" is <br />probably intended. <br />2. Map 2 1 -1 Drainage Plans: <br />a) See comment lb) for Map 15 -1 <br />b) See comment Ic) for Map 15 -1 <br />Volumes III and IX <br />I did not review these materials. <br />This concludes my preliminary adequacy review for TR -84. Please contact me with any <br />questions you may have. <br />Cc: Sandy Brown, DRMS <br />