Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 005 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3554 <br />Adjusted unit production: 665.31 LCY/hr <br />Adjusted fleet production: 665.31 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.388/LCY <br />Total job time: <br />Total job cost: <br />2.98 Hours <br />$767.63 <br />CIRCES Cost Estimating Software <br />