Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: Regrade Construction Material Stockpile <br />Site: McClane Canyon Mine Permit Action: MT7 Permit/Job #: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 005 State <br />Date: 12/30/2013 County <br />User: ZTT <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Colorado <br />Garfield <br />DRMS <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C004 -005 <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,700 <br />Swell factor: 1.165 <br />Loose volume: 1,981 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />60 feet <br />1,872.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />5,600 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />Dozing method: 1.000 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,700 <br />Swell factor: 1.165 <br />Loose volume: 1,981 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />60 feet <br />1,872.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />5,600 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG. <br />Material consistency: 0.900 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />