My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-31_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2013-12-31_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:26 PM
Creation date
1/6/2014 1:48:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/31/2013
Doc Name
Midterm Review & Cost Estimate
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
MT7
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 007 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.70 Minutes <br />0.60 Minutes <br />Site Altitude: 5600 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: <br />1.000 <br />NA <br />(CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 5600 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.79 <br />Haul Time: 0.79 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.41 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 452.40 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.727 /LCY <br />0.41 <br />minutes <br />2.50 <br />minutes <br />375.49 <br />LCY/Hour <br />1 <br />Scraper(s) <br />375.49 <br />LCY/Hour <br />375.49 <br />LCY/Hour <br />Total job time: 24.97 Hours <br />Total job cost: $6,813.31 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.