My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-31_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2013-12-31_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:26 PM
Creation date
1/6/2014 1:48:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/31/2013
Doc Name
Midterm Review & Cost Estimate
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
MT7
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Place Three Feet of Cover on Coal Mine Waste Pile <br />Site: McClane Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Pagel of 2 <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -007 <br />COSTShift basis: der dgy <br />Cost Breakdown: Scraper Work Team Sunnort Equipment Maintenance Eauipment <br />Total work team cost/hour: $272.89 <br />MATERIAL QUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.250 <br />Loose volume: 9,375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$63.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$179.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$272.89 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $272.89 <br />MATERIAL QUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.250 <br />Loose volume: 9,375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,650 lbs/LCY <br />Material description: <br />Decomposed rock - 25% Rock, <br />22.00 <br />75% Earth <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />19.92 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.