My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-19_HYDROLOGY - M1982131
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1982131
>
2013-12-19_HYDROLOGY - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:13 PM
Creation date
12/23/2013 9:18:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
HYDROLOGY
Doc Date
12/19/2013
Doc Name
Substitute water supply plan - 11/01/2013-10/31/2014
From
DNR Division of Water Resources
To
Applegate Group, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table No. 4 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M- 1982 -131) <br />WY 2014 Estimated GIC Subsurface Return Flow Obligations <br />�I( Applegate <br />Group, Inc. <br />Date Revised: 9/23/2013 <br />AG Job #: 08 -127 <br />Water Year <br />GIC Direct Flow <br />=' Fossil <br />Reservoir° <br />WY 2014 <br />GIC Direct <br />GIC Direct <br />Creek_ <br />Fossil Creek' <br />Fossil Creek <br />2010 <br />Subsurface <br />Subsurface <br />Subsurface'. <br />Subsurface`= <br />34.20 <br />Return Flow <br />RF Obligation <br />. Return F)ow <br />RF.Cibligation <br />0.00 <br />Factor <br />[ac -ft] <br />Factor- <br />1.55 <br />Month <br />(A) <br />(B)- <br />- <br />(C,, a; <br />(D) . <br />November <br />2.1% <br />1.34 <br />2.0% <br />0.01 <br />December <br />2.0% <br />1.28 <br />1.8% <br />0.01 <br />January <br />1.8% <br />1.15 <br />1.7% <br />0.01 <br />February <br />1.7% <br />1.09 <br />1.6% <br />0.00 <br />March <br />1.6% <br />1.02 <br />1.5% <br />0.00 <br />April <br />1.5% <br />0.96 <br />1.4% <br />0.00 <br />May <br />1.8% <br />1.15 <br />1.3% <br />0.00 <br />June <br />2.1% <br />1.34 <br />1.2% <br />0.00 <br />July <br />2.3% <br />1.47 <br />1.5% <br />0.00 <br />August <br />2.4% <br />1.54 <br />2.4% <br />0.01 <br />September <br />2.4% <br />1.54 <br />2.5% <br />0.01 <br />October <br />2.3% <br />1.47 <br />2.1% <br />0.01 <br />Total <br />24.0% <br />15.36 <br />21.0% <br />0.07 <br />Water Year <br />Total Annual Delivery [ac-ft] <br />Remarks <br />GIC Direct Flow <br />Fossil Creek Reservoir <br />2009 <br />45.82 <br />0.00 <br />From District 3 Water Commissioner Accounting <br />2010 <br />60.98 <br />0.00 <br />From District 3 Water Commissioner Accounting <br />2011 <br />34.20 <br />0.00 <br />Based on SWSP accounting <br />2012 <br />97.92 <br />0.00 <br />Based on SWSP accounting <br />2013 <br />81.12 <br />1.55 <br />Based on actual and projected deliveries <br />Average <br />64.01 <br />0.31 <br />Notes: <br />(A) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(B) Equals Column (A) multiplied by the average total annual delivery of GIC direct flow water <br />(C) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(D) Equals Column (C) multiplied by the average total annual delivery of Fossil Creek Reservoir water <br />N: \08127 Bucklen Pit Augmentation \Disciplines (Technical) \Water Rights \SWSP \WY 2014 \Bucklen Pit 2014.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.