My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-19_HYDROLOGY - M1982131
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1982131
>
2013-12-19_HYDROLOGY - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:13 PM
Creation date
12/23/2013 9:18:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
HYDROLOGY
Doc Date
12/19/2013
Doc Name
Substitute water supply plan - 11/01/2013-10/31/2014
From
DNR Division of Water Resources
To
Applegate Group, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table No. 3 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M- 1982 -131) <br />Applegate <br />Group, <br />Lagging Distance (X) = 1,390 feet <br />Aquifer Transmissivity (T) = 120,000 gallons per day per foot <br />Specific Yield = 0.2 <br />Aquifer Width (W) = 10,650 <br />Date Revised: 9/23/2013 <br />Lagged Depletions AG Job #: 08 -127 <br />From Minin¢ <br />WY 2014 <br />Month <br />Evaporation. <br />CU <br />[ac -ft] <br />(A) <br />Uperat'iori <br />CU : <br />[ac -ft] <br />(B) <br />Total :- <br />GU '- <br />[ac -ft) <br />(C) <br />' '_ lagged = -_ <br />Depletions_._, <br />(D): <br />November <br />1.31 <br />0.21 <br />1.52 <br />2.97 <br />December <br />0.00 <br />0.18 <br />0.18 <br />2.02 <br />January <br />0.00 <br />0.26 <br />0.26 <br />1.45 <br />February <br />1.38 <br />0.15 <br />1.52 <br />1.52 <br />March <br />1.80 <br />0.75 <br />2.55 <br />2.24 <br />April <br />2.92 <br />0.85 <br />3.77 <br />2.86 <br />May <br />3.85 <br />0.92 <br />4.77 <br />3.69 <br />June <br />5.43 <br />0.79 <br />6.22 <br />4.47 <br />July <br />5.97 <br />0.87 <br />6.84 <br />5.36 <br />August <br />5.51 <br />0.98 <br />6.49 <br />5.59 <br />September <br />3.89 <br />0.73 <br />4.62 <br />4.95 <br />October <br />1 2.54 <br />0.78 <br />1 3.32 <br />4.23 <br />Total <br />1 34.60 <br />7.45 <br />1 42.05 <br />41.35 <br />Notes. <br />(A) Evaporation CU from Table 1 <br />(B) Operation CU from Table 2 <br />(C) Total CU = (A) + (B) <br />(D) Lagged depletions from total CU. Accounts for evaporation and operational uses from prior SWSPs <br />N: \08127 Bucklen Pit Augmentation \Disciplines (Technical) \Water Rights \SWSP \WY 2014 \Bucklen Pit 2014.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.