My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-20_REVISION - C1994082 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2013-12-20_REVISION - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:18 PM
Creation date
12/20/2013 1:23:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
12/20/2013
Doc Name
Routt County Roundabout project "Punchlist"
From
Routt County Road & Bridge Dept.
To
DRMS
Type & Sequence
SL5
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. There are two areas on the concrete pavement where ponding occurs. Both areas are in the <br />eastbound lane on CR 27A approaching from CR 27. Solutions to fix this area should be <br />provided to Routt County Road and Bridge for approval prior to fixing area. <br />5. Ponding is also occurring in the ditch on the south side of CR 27A in the area where ponding is <br />occurring on the pavement. <br />6. Clean out broken louver pieces in flashing beacon above "Roundabout Ahead" sign on CR 27A <br />7. First light pole after gravel section of CR 27A meets paved section needs to be plumbed up. <br />8. Most southern light pole on CR 27 on east side of the road needs to be plumbed up. <br />9. Fence on northeast side of the roundabout where power line crosses fence needs to be grounded <br />per specifications. <br />10. Duckels Construction to provide necessary approvals from Routt County Building department for <br />electrical work. <br />11. Material testing reports provided to Routt County Road and Bridge from Duckels Construction <br />still show two failing compaction tests. Soil shall be reworked until passing test are <br />accomplished. <br />12. After a discussion with Ed Brady about quantities, he informed Diane and Mike that while <br />Duckels was hauling waste to the mine disposal site Peabody was hauling to the same spot. Ed <br />feels that approximately 2,000 CY of the 8,797 CY is from the excavation performed by Peabdy <br />Energy to build their office parking lot. Ed claims that they were hauling at the same time <br />Duckels was and the 8797 CY provided in the survey is not accurate. Please adjust quantity <br />accordingly. <br />Again please review and let me know if you have any questions, comments or corrections. This work will <br />need to be completed as well as the asbuilts supplied before the final pay application can be submitted and <br />retainage released. <br />Thanks, <br />Mike Mordi, P.E. <br />Assistant Director <br />Routt County Road and Bridge <br />
The URL can be used to link to this page
Your browser does not support the video tag.