December 18,2013 C-1982-056/Foidel Creek Mine JDM <br /> constructed as designed. Phase 1 of the RDA expansion is nearing completion. TR67 was approved with a <br /> stipulation that future bonding for each phase of construction will be required prior to the initiation of the next <br /> Phase. <br /> The first bench has been completed and the second bench is near elevation. The out slope of the first bench is <br /> stable with soil placed and the out-slope of the second bench is stable. The construction of the east perimeter ditch <br /> is on-going with crews' on-site conducting ditch cutting at the time of the inspection. Two of the three <br /> piezometers have been installed. <br /> - ` <br /> Installed Piezometers <br /> •�_ <br /> _ u -�--ems-- � � - .._..-,•�, <br /> i _ .M _� '► <br /> RDA RDA Bench No.1 with Soil <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and(6)Reclamation 4.03.1(7)/4.03.2(7): <br /> Roads throughout the mine site were snow-covered and frozen but stable at the time of the inspection. All roads <br /> were in good condition with no problems noted,with the exception of the following: <br /> - As noted in the September through November 2013 inspections,maintenance work conducted along Haul Road <br /> C and the Brown Palace access road to clear the roadside culvert and the sediment pump was conducted. This <br /> maintenance breached the established berm and failed to re-establish proper drainage to the sump on the east side <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 5 <br />