RECLAMATION COSTS <br />EXHIBIT L <br />The worst case reclamation scenario will take place at the end of the mining of the processing <br />area. This is the point where the amount of dewatering needed to drain the pit for reclamation <br />would be the maximum (1,409 ac -ft). A breakdown of the reclamation costs for this worst case <br />scenario can be seen below. <br />Worst case reclamation costs for this scenario are shown in Table L -1: <br />Table L -1 Reclamation Task and Cost Estimate <br />Tomichi Pit, December 2013 L -1 <br />Activity Description <br />Units <br />Unit Cost <br />Activity Cost <br />1 <br />Dewatering of all unreclaimed pit areas. <br />1,409 <br />ac -ft <br />$ 75.00 <br />$ 105,675 <br />2 <br />Backfill and grading of remaining <br />unreclaimed sloe maximum of 1200 ft.. <br />11,533 <br />CY <br />$ 1.50 <br />$ 17,300 <br />3 <br />Backfill and grading of sediment pond <br />936 <br />CY <br />$ 1.50 <br />$ 1,403 <br />4 <br />To soiling of remaining sloe <br />2,007 <br />CY <br />$ 1.50 <br />$ 3,011 <br />5 <br />Removal of roads <br />0.50 <br />acres <br />$ 200.00 <br />$ 100 <br />6 <br />Removal of facilities <br />$ 2,500 <br />7 <br />Topsoiling of remaining disturbed areas <br />1,678 <br />CY <br />$ 1.50 <br />$ 2,517 <br />8 <br />Seeding and mulching (Wetlands) <br />I 2.92 <br />acres <br />$1,100.00 <br />1 $ 39212 <br />9 <br />1 Seeding and mulching (Rangeland) <br />13.69 <br />acres <br />$ 700.00 <br />1 $ 9,583 <br />Subtotals <br />$ 145,301 <br />DRMS Costs (28% x direct costs) <br />$ 40,684 <br />Total Bond Amount <br />$ 185,985 <br />Tomichi Pit, December 2013 L -1 <br />