Laserfiche WebLink
five days a week, with the possibility of repairs being conducted on Saturdays. Special <br />operations may require extended hours of operation. <br />The access will be gated to prevent entry during off hours. <br />7. Haul Roads and Access <br />Site access will be achieved through the road to be installed as shown on Map C -2. Internal haul <br />roads will be reclaimed, but the main access will remain. <br />Tomichi Pit, December 2013 D -7 <br />