Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 81 of 148 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.807 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3629 <br />Adjusted unit production: 623.79 LCY/hr <br />Adjusted fleet production: 1871.37 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.513/LCY <br />Total job time: 0.37 Hours <br />Total job cost: $350.65 <br />CIRCES Cost Estimating Software <br />