Cost Summary Worksheet Cont'd Task # 000 Page 80 of 148 <br />Task description: <br />Site: Elk Creek Mine <br />BULLDOZER WORK <br />Remove Gravel from Substation No. 3 to Sediment Pond <br />Permit Action: Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 076 State: Colorado <br />Date: 10/3/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Permit/Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -076 <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $959.78 <br />MATERIAL OUANTITIES <br />Initial Volume: 645 <br />Swell factor: 1.060 <br />Loose volume: 684 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />DRAWING s -091 <br />Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Dry, non - cohesive 0.8 <br />Average push gradient: 5% <br />Average site altitude: 6,200 feet <br />Material weight: 2,850 lbs/LCY <br />Weight description: Gravel - Dry (1 /4 " "- 2 " "diam.) <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.800 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$99.15 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $959.78 <br />MATERIAL OUANTITIES <br />Initial Volume: 645 <br />Swell factor: 1.060 <br />Loose volume: 684 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />DRAWING s -091 <br />Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Dry, non - cohesive 0.8 <br />Average push gradient: 5% <br />Average site altitude: 6,200 feet <br />Material weight: 2,850 lbs/LCY <br />Weight description: Gravel - Dry (1 /4 " "- 2 " "diam.) <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.800 (CAT HB) <br />CIRCES Cost Estimating Software <br />