Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 49 of 148 <br />Task description: Rip and <br />Site: Elk Creek Mine <br />BULLDOZER WORK <br />rade C -Seam Access Road <br />Permit Action: Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 10/3/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D 10 - 10SU <br />574 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -040 <br />Total unit Cost/Hour: $343.09 <br />Total Fleet Cost/Hour: $1,029.26 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,056 <br />Swell factor: 1.165 <br />Loose volume: 1,230 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 6,200 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$110.68 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$11.64 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $343.09 <br />Total Fleet Cost/Hour: $1,029.26 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,056 <br />Swell factor: 1.165 <br />Loose volume: 1,230 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 6,200 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />