My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-16_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2013-12-16_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:06 PM
Creation date
12/17/2013 9:23:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
12/16/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Kiger
Type & Sequence
RN6
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 48 of 148 <br />BULLDOZER RIPPING WORK <br />Task description: Rip All Surface Facility Areas <br />Site: Elk Creek Mine Permit Action: Renewal 6 Permit/Job #: C1981022 <br />Seismic: <br />Area: <br />PROJECT IDENTIFICATION <br />Task #: 034 State: Colorado <br />Date: 10/3/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - IOSU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: CO22 -034 <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />NA <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$110.73 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper Operating Cost/Hour: <br />$10.01 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total Unit Cost/Hour: <br />$341.51 <br />Total Fleet Cost/Hour: <br />$1,024.54 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: <br />NA <br />BCY <br />90.20 acres Rip Depth (ft): 2.00 <br />Volume: 291,045 <br />Source of estimated quantity: <br />Page 2.05 -20 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.00 <br />mph <br />Average Ripping Width: <br />8.67 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.979 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.979 <br />Acres /hr <br />Site Altitude: <br />6,200 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.81 <br />Acres /hr <br />Adjusted Hourly Fleet Production: <br />2.44 <br />Acres /hr <br />JOB TIME AND COST <br />Fleet size: 3 Grader(s) <br />Total job time: <br />37.00 <br />Unit cost: $420.237 Per acre <br />Total job cost: <br />$37,906.00 <br />NA <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.