Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 15 of 148 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 6200 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6200 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2800.00 <br />-10.00 <br />5.00 <br />-5.00 <br />2972 <br />0.99 <br />Haul Time: 0.99 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2800.00 <br />10.00 <br />5.00 <br />15.00 <br />1047 <br />2.70 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 657.84 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />2.70 minutes <br />5.29 <br />minutes <br />546.01 <br />LCY/Hour <br />2 <br />Scraper(s) <br />546.01 <br />LCY/Hour <br />546.01 <br />LCY/Hour <br />Fleet size: <br />1 <br />Team(s) <br />Total job time: <br />148.35 Hours <br />Unit cost: <br />$1.340 <br />/LCY <br />Total job cost: <br />$108,516.98 <br />CIRCES Cost Estimating Software <br />