Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 14 of 148 <br />Task description: <br />Site: Elk Creek Mine <br />SCRAPER TEAM WORK <br />Move Fill Material from Elk Creek Mine to Elk Creek Facilities <br />PROJECT IDENTIFICATION <br />Permit Action: Renewal 6 <br />Task #: 006 State: Colorado <br />Date: 10/3/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Permit/Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -006 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $731.50 <br />MATERIAL QUANTITIES <br />Initial volume: 72,000 CCY Swell factor: 1.125 <br />Loose volume: 81,000 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$731.50 <br />Support: <br />$0.00 <br />Maine <br />$0.00 <br />Total work team cost/hour: $731.50 <br />MATERIAL QUANTITIES <br />Initial volume: 72,000 CCY Swell factor: 1.125 <br />Loose volume: 81,000 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />