Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date: <br />24- Jun -13 <br />Permit <br />C- 1982 -057 <br />Site: Seneca II -W Mine <br />User: <br />JLE <br />I <br />State : Colorado <br />Filename: <br />C057 -00h <br />County: Routt <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Midterm Review No. 6 (MT6) <br />Topsoil Replacement Tasks - Tasks 076 -085 <br />Task <br />Task Description <br />TASK HOURS <br />DIRECT COST <br />076 <br />Replace Topsoil from Stockpile ZZ to Final Pit Area <br />Rev. MT6 <br />74.10 <br />$120,655 <br />077 <br />iReplace Topsoil from Stockpile A to TAHR Stations 144 +00 to 216 +00 <br />PR6 Reduction <br />0.00 <br />$0 <br />078 <br />Replace Topsoil from Stockpile C to TAHR Stations 92 +00 to 144 +00 <br />PR6 Reduction <br />0.00 <br />$0 <br />079 <br />Replace Topsoil from Stockpile D to TAHR Stations 76 +00 to 92 +00 <br />PR6 Reduction <br />0.00 <br />$0 <br />080 <br />Replace Topsoil from Stockpile E to TAHR Stations 40 +00 to 76 +00 <br />PR6 Reduction _ 0.00 <br />PR6 Reduction 0.00 <br />$0 <br />$0 <br />081 <br />Replace Topsoil from Stockpile F to TAHR Stations 16 +00 to 40 +00 <br />082 <br />Replace Topsoil from Stockpile G to TAHR Stations 0 +00 to 16 +00 <br />PR6 Reduction 0.00 <br />$0 <br />083 <br />Replace Topsoil from Stockpile AAA to Final Pit Area <br />Rev. MT6 <br />105.04 <br />$171,024 <br />084 <br />Replace Topsoil from Stockpile DDD to Final Pit Area <br />Rev. MT6 <br />! 38.01 <br />$61,886 <br />085 <br />Replace Topsoil from Stockpile EEE to Final Pit Area <br />Rev. MT6 <br />33.85 <br />$55,109 <br />I <br />Total Direct Cost <br />251.00 <br />$408,674 <br />JLE page 8 of 13 6/26/2013 <br />